Heater network heater installation
-
Basic inspection: Firstly, the sundries on the foundation should be removed, and a temporary and reliable fence should be erected on the edge; level gauges for measuring elevation, Ф0.5mm steel wire, wire hammer, ink fountain and adjustable brackets for pulling steel wire ropes should be prepared; foundation center given by civil engineering line position, check whether the vertical and horizontal centerlines are vertical.[link text]( link url)https://www.vacfurnace.com/technology-frontiers/vacuum-annealing-process-of-steel-ring/
After the center line meets the requirements, use a hammer to cast the center position on the foundation embedded part or the foundation edge angle iron frame, and mark it; [link text]( link url)https://www.vacfurnace.com/technology-frontiers/research-on-properties-of-h13-after-vacuum-nitriding/